Golden Temple Repair Work Nears Completion

SIKH SANGAT
INDIA---The restoration work on the interiors of the Golden Temple’s first floor is inching towards completion. Sources said the gold work had been restored on the walls and roofs of the ‘parikarma’. Now only arches were left. Similarly, restoration work is almost 30 per cent done on one of the staircases leading from the first floor to the second floor of the shrine.A special gold paint manufactured by a European firm is being used in the conservation work. It is 22 carat gold and 10 gm of this paint costs around Rs 1 lakh. The gold work inside the shrine had suffered damage with passage of time as well as pollution. [link]